1. Enter values
Use consistent units and the requested inputs.
Country-neutral calculator for Welding Dikisi and Sarf Planlama Analysis - Basit Celik Konstruksiyon Welding Metali Volume.
Use consistent units and the requested inputs.
Use the main result and breakdowns as a planning estimate.
For regulated topics, verify current local rules before acting.
Ideal fillet deposit volume V(cm³)=0.5×leg(mm)²×length(m)
Inputs: leg=3 mm; length=5.7 m
Simplified preliminary engineering screening only.
Ideal triangular equal-leg fillet deposit; area is not the effective throat area for strength design. Weld volume assumes leg and length units exactly as labelled. Filler mass estimates ignore start/stops, spatter, root gaps and over-welding; arc-on deposition hours are not full labor time. Efficiency must be in (0,100%].
Review the values and units used by this calculator before calculating.